Permits made simple.
Accelerate municipal approvals with AI. Pinpoint exact submission requirements, automatically verify compliance, and produce fully vetted application packages built for fast-track approval.
Values are typical of the zone class and were entered manually. Always confirm against the source PDF — see Zoning details below.
Map shows a 7.6 m uniform inward buffer for reference.
Off-street parking per zoning bylaw Part 10 (Off-Street Parking and Loading)
R2 Urban Detached Residential Zone. PROPOSED - DNV Bylaw 8799 (Schedule A), "Bylaw Under Consideration" dated 2 June 2026, NOT yet adopted; verify before relying on it. Principal-building min setbacks: front 3.1m, side 1.2m, rear 7.6m (7.6m abutting a lane; ocean 7.6m). Coach house permitted with its own setbacks (front 15.2m, rear 3.1m / 1.5m abutting lane, side 1.2m). Height: front 6.1m max 6.7/8.5m (2 storeys); remainder max 10.1/11.6m (3 storeys); coach house 6.7/8.5m (2 storeys). Building coverage 55%/45% (<=/>464.5 m2); front 6.1m capped 25%. Max GFA (no coach house) = net lot x0.7+92.9 (<=464.5 m2) / x0.55+92.9 (>464.5 m2), cap 650.3 m2; WITH coach house x0.7+139.4 / x0.55+139.4, cap 696.8 m2; coach house max 130.1 m2. Min subdivision lot 660 m2 / 18m width / 34m depth. Secondary suite + coach house permitted.
A new home here would need a demolition permit first.
- In a debris flood or debris flow hazard area
- Not confirmed
- In the Seymour River flood plain
- No
- In the 1 m sea level rise area
- Not confirmed
- A stream within 15 m
- Not confirmed
Fetched live from muni ArcGIS + OpenDataSoft endpoints (~10006 ms). Not cached. Sources checked: Slope hazard · Streamside protection · Wildfire hazard · Creek hazard · DPA Form and Character · DPA Natural Environment · DPA Energy/Water/GHG · BC — Provincially designated floodplain · Sea level rise · BC — Agricultural Land Reserve.
- In any of DNV's development permit areas
- Not confirmed
- In DNV's wildfire development permit area
- No
- In DNV's slope hazard development permit area
- No
- In DNV's natural environment development permit area
- Not confirmed
- In DNV's streamside development permit area
- No
- In the Agricultural Land Reserve
- No
- In DNV's fire limits area
- Not confirmed
No structure on record.
- BC Building Code (2024)
- Open ↗
- BC Plumbing Code (2024)
- Open ↗
- BC Energy Step Code (current)
- Open ↗
BC Building Code + Plumbing Code + Energy Step Code apply. The local municipality's construction / permit bylaw governs application, fees, and any local amendments.
| # | LAT | LON |
|---|---|---|
| A | 49.327270 | -123.072269 |
| B | 49.327271 | -123.072751 |
| C | 49.327090 | -123.072751 |
| D | 49.327089 | -123.072269 |
| EDGE | LENGTH | BEARING |
|---|---|---|
| A → B | 34.94 m | N 89° 52' 20" W |
| B → C | 20.10 m | S 0° 06' 12" W |
| C → D | 34.94 m | S 89° 51' 15" E |
| D → A | 20.12 m | N 0° 06' 12" E |
From ParcelMap BC. Not a substitute for a registered survey.
- burnaby-zoning
- Oct 5, 2026 · 903 records
- cnv-trees
- Oct 1, 2026
- coquitlam-zoning
- Oct 5, 2026 · 1,087 records
- dnv-permits
- Oct 5, 2026 · 5,476 records
- dnv-zoning
- Oct 5, 2026 · 2,616 records
- parcelmap-bc
- Sep 1, 2026 · 833,237 records
- richmond-zoning
- Oct 5, 2026 · 2,231 records
- source-doc-recheck
- Oct 5, 2026
- source-doc-reingest
- Sep 23, 2026
- surrey-zoning
- Oct 5, 2026 · 4,272 records
- west-van-zoning
- Oct 5, 2026 · 300 records
- zoning-rules-baseline
- Sep 27, 2026
- zoning-rules-llm
- Sep 28, 2026
- zoning-rules-seed
- Jun 26, 2026
Read from each municipality's own published data. Confirm with the municipality before making design decisions. They make the determination, not this tool.
We don't check these here yet: Trees, Heritage, Easements, Utilities, Applications.
Built for applicants & municipalities.
Municipalities
Streamlined permit intake tools for modern municipal teams.
Equip staff with diagnostic tools to eliminate manual checks and speed up approvals.
See how it works →
Homeowners
Smarter pre-submission checks for homeowner peace of mind.
Verify your designer's plans against city bylaws and eliminate any missing details before you submit.
See how it works →
Professionals
Smarter permit verification tools to keep projects moving.
Catch missing submission requirements upfront to eliminate frustrating kickbacks and keep projects moving.
See how it works →
Applicant
preparation
Permit Nav checks permit packages against municipalities' own published checklists and tells you what is missing, so rejections that would have cost days, weeks or even months of slow down, turns into a quick fix at your desk.
Municipal
review
Automated diagnostic tools standardize permit intake by instantly auditing drawing sets and forms for municipal compliance. By eliminating manual package triage, your staff reduces back-and-forth friction.
Live in 9 Metro Vancouver municipalities.
Support for
Early access · Metro Vancouver
Permits made simple.
Get early access and test new features by signing up for our demo. You won't receive any spam, just a chance to be part of something great.









